pre-heater, drying tunnel
pre-heater + drying tunnel
Pre-heater are used in front of a painting line or shot blaster. The use before shot blasting is to dry the material. Drying of wet material is reducing jamming of abrasive shot blast material. Pre-heating before painting will improve the paint result and the speed can be increased.
Drying tunnel are placed behind the painting machine. The heated air inside the tunnel will dry the painted material before unloading from the chain conveyor.
Latest news
Nenok employees complete training on Ficep Excalibur single-spindle drilling machineCologne, Germany, July 25, 2024 - Nenok GmbH, a leading steel processing machinery sales and service company, has…
July 2024 - Nenok, a leading supplier for the trade and reconditioning of machine tools for steel processing, has announced the successful completion of the loading of a Union boring mill for a heavy…
Visit NENOK at the STEELDAYS of VERNET BEHRINGER on June 25 and 26, 2024 in Dijon / France.As a used machinery specialist, Nenok will be represented as a guest exhibitor at this important event with…
Nenok offers an in-house training course on the Voortman V600 profile beam drilling machine, led by Jürgen Hönsch, an expert in steel processing machines. This training aims to provide employees with…